 Custom cabinets
completed! |
 Projector cables
fished through. |
 And attached. |
 Main speaker wires pulled
through |
 Labeled and stripped. |
 Banana-plug receptacles
attached. |

As they lay |
 Connectors in switchlate. |
 Same procedure for
center-channel. |
 Unfortunately, there's
not enough space for jacks |
 So I just ended the wire
in banana plugs. |
 The sub got a little
surge protector |
 Roughing up the railing
surface with steel wool.. |
 ...so they'll take 3
coats of black lacquer per Lynn |
 Since Dad was here we
fixed the bottom of the bar |
 You can see what water
does after 70 years |
 |
 Detail of refrigerator
door |